Our work

Real buildings, real equipment, real numbers. Every photograph on this site is our own work — no stock photography.

Office center, Burlington County NJ

13 rooftop units totalling 310 tons, replaced in a single day. A complete rooftop plant replacement — possible in one day only because of the weeks of survey, staging and crane sequencing that happened first.

  • 13 rooftop unit replacements
  • 310 tons of cooling capacity
  • One day on-site turnaround, in July

Read the full project

Rooftop unit lifted by crane over an office center

Modular gym and offices, Central NJ

Ductwork and diffusers for a gymnasium built from modules. A large open volume with a high ceiling is one of the harder spaces to distribute air into well.

  • 16″ flex duct to concentric ductwork
  • Ductless splits for the offices
  • Test run in both heat and A/C

Read the full project

Rooftop units set on a modular gymnasium building

Medical office, Vineland NJ

A full system replacement in an attic. Everything out, everything new back in, and a condensate safety switch fitted because the equipment sits above an occupied space.

  • New furnace, A-coil and condenser
  • Condensate safety switch in the drain pan
  • Test run in both A/C and heat

Read the full project

New York condensing unit outside a medical office in Vineland

Retail center, Mount Laurel NJ

Three 7.5-ton rooftop units replaced. The everyday version of commercial replacement work — a handful of units, a crane, and a lot that had to stay open while it happened.

  • 3 rooftop unit replacements
  • 7.5 tons each — 22.5 tons total
  • Crane staged in an occupied retail lot

Read the full project

New rooftop unit lowered onto a retail center roof in Mount Laurel, New Jersey